Construction & Builders Cleaning
Construction & Builders Cleaning in Perth
Rough, final and handover cleans for builders, project managers and property managers preparing a site for inspection or occupancy.
- $20M public liability insured
- Police-checked crews
- WA owned & operated
OVERVIEW
Who it's for
A construction clean is not one job — it is a sequence of different jobs, each with its own purpose, timed against the build program rather than against a single "clean the site" instruction. A rough clean makes a site workable and safe for finishing trades. A final or detail clean is what practical completion and a client walkthrough are actually measured against. A sparkle clean touches up whatever dust has settled since the final clean, right before handover. And a defect clean picks up after a remedial trade has been back inside a completed home or tenancy. Getting the wrong stage — or skipping one — is one of the most common reasons a handover slips or a defect list grows longer than it should.
We work with builders and project managers across Perth on new builds, renovations, shopfitouts and multi-unit developments, and we scope each stage separately rather than quoting "a builders clean" as a single flat-rate line item. That matters because the rough clean and the final clean call for genuinely different work: one is bulk removal and making the site safe to move around in, the other is detail — glass, tracks, hardware, cabinetry, grout haze, silicone and paint speck removal — done to a standard a purchaser or tenant will actually notice.
The other thing we are upfront about, because almost nobody in the Perth builders-clean market mentions it, is that the method used to remove construction dust is itself a regulated activity in WA, not just an unregulated finishing step. That shapes how we clean a site, not just what we clean.
Builders, project managers and property managers preparing a site for inspection or handover.
WHAT WE DO
Handover stages we cover
- Rough clean during construction
- Final / builders clean
- Defect and detail clean
- Window and glass detailing
- Dust removal and surface wipe-down
- Handover-ready presentation
Rough / builders clean
- Bulk debris and offcut removal
- Gross dust knock-down using wet or vacuum-led methods
- General sweeping and vacuuming to make the site workable
Final / detail clean
- Glass, frames, tracks and hardware
- Cabinetry, benchtops and joinery inside and out
- Tile grout haze and mortar splatter removal
- Protective film, silicone smear and paint speck removal
- Fixtures, fittings and floor surfaces
Sparkle / pre-handover clean
- Touch-up of dust settled since the final clean
- Fingerprint and touch-point removal
- Glass re-polish before client walkthrough
Defect / post-defect clean
- Clean-up after a remedial trade has returned to site
- Localised detail clean around the rectified area
Pricing is based on site size and scope. Price on application — request a quote for a clear, fixed price after a site walkthrough.
COMMON PROBLEMS
Common problems we solve
- Dry sweeping and blowing down dust before finishing trades arriveDry sweeping and pressurised air blowing of dust containing crystalline silica is itself high-risk work under WA silica rules — so a rough clean is planned around wet methods and vacuum-led dust control rather than a broom and a blower.
- A rushed final clean generating its own defect itemsSilicone smears, tile grout haze, film adhesive residue and mortar left on frames are cleaning-caused defects, not construction ones — and they cost a return visit inside the defect liability period. We treat the detail clean as defect prevention, not an afterthought.
- Settled dust visible again at the client walkthroughA sparkle clean immediately before handover picks up dust that has settled since the final clean and re-polishes glass and fingerprint-prone surfaces, so the site presents the way it did at final inspection.
- Grout haze and mortar splatter left on new tilingCement and grout residue on tiles needs the right chemistry and technique to lift without scratching the surface — we treat it as its own step rather than a general wipe-down.
- Uncertainty about what a clean can and cannot fixScratched glass, damaged protective film, etched tile and cured silicone bonded to porous stone are damage, not soiling — we flag these before we start rather than let a client discover them at handover.
- Coordinating a clean around other trades still on siteWe work to the site timeline you give us and coordinate access with your site supervisor, so the clean happens without holding up the trades still finishing around it.
WHY IT MATTERS
What you get
- Every handover stage coveredRough clean, final builders clean, sparkle clean and defect-stage clean — engage us for one stage or the whole sequence through to handover.
- Defect-list awarenessA properly done final clean makes it easier to spot genuine defects at inspection, and avoids adding cleaning-caused marks to the list in the first place.
- Handover-ready finishGlass, tracks, hardware, cabinetry and surface detail cleaned to the standard a client walkthrough or practical completion inspection is measured against.
- Insured for construction environments$20 million public liability insurance and police-checked crews — the baseline compliance most builders and principal contractors ask for.
AT A GLANCE
The four handover stages
| Stage | When | What it is |
|---|---|---|
| Rough / builders clean | After structure and services, before final trades | Bulk debris and offcut removal, gross dust knock-down, sweeping and vacuuming — making the site safe and workable for the trades still to come |
| Final / detail clean | Pre-practical completion | Full detail: glass, frames, tracks and hardware, cabinetry inside and out, tile grout haze, protective film removal, silicone and paint speck removal, fixtures and floors |
| Sparkle / pre-handover clean | Immediately before handover or client walkthrough | Touch-up of dust settled since the final clean, fingerprint removal, glass re-polish |
| Defect / post-defect clean | During the defect liability period | Clean-up after a remedial trade has returned to fix a defect item |
This is trade convention for how a build is sequenced, not a code requirement — the exact stages and timing are set by your project program.
HOW IT WORKS
How it works
Stage briefing
Tell us which stage you need — rough, final, sparkle or defect — and the site timeline. We confirm exactly what is covered at each stage.
Site access
We coordinate with your site supervisor on access, induction requirements and any restricted areas before the crew arrives.
Stage clean
The crew works through the agreed scope for that stage — dust, debris, glass detailing, surface wipe-downs and any specified detail items.
Walkthrough and sign-off
We walk the finished areas with you against the agreed scope, so you know what has been done ahead of your next milestone — inspection, client walkthrough or handover.
IN DETAIL
How we think about a construction clean
A proper final clean shortens the defect list
Dust and construction residue mask real defects at inspection — a scratch, a chip or a paint fault is much easier to miss under a film of dust than on a genuinely clean surface. The less obvious point is that a poorly done clean actively creates defect items of its own: silicone smears left on glass, grout haze not lifted from new tiling, adhesive film residue, mortar smeared on frames. Every one of those is now something a defects list has to capture, and something a trade has to be sent back to fix inside the defect liability period.
Framed that way, a properly staged final clean is not tidying up before a walkthrough — it is a direct input into how long the defect list runs and how many return visits a job needs before it is closed out. We do not put a number on how long any defect liability period runs, because that is set by the building contract, not by us, but the logic holds regardless of the exact window: less cleaning-caused defect noise means less rework, full stop.
There's a related point about handover documentation that's worth stating plainly, because it is genuinely useful and nobody else says it. The building code does not prescribe cleaning — there is no such thing as "NCC-compliant cleaning" — but a proper final clean is what actually makes compliance items visible and legible for a certifier or client at inspection: certification labels, tags, glazing marks, smoke alarm units and weather seals need to be seen clearly to be checked, and dust or film residue over the top of them is a genuine inspection obstacle.
Silica — the way dust is removed is regulated, not just the way it is made
Most Perth builders-clean pages talk about dust as a presentation issue. On a WA site it is also a regulatory one, and this is the point that changes how a rough or defect clean should actually be done. WorkSafe WA treats sweeping or pressurised air blowing of dust containing crystalline silica as covered high-risk work in its own right — not just the cutting, grinding or drilling that generated the dust in the first place. That means the cleaning method used to knock down dust on a WA construction site is itself inside the regulatory frame, and dry sweeping or blowing down a dusty slab is exactly the activity the rule is describing.
This sits inside a broader set of WA rules that commenced or tightened recently: amendments to the WHS (General) Regulations 2022 (WA) covering crystalline silica substances commenced on 1 September 2024, and the workplace exposure standard for respirable crystalline silica is 0.05 mg/m³ averaged over an eight-hour shift. Separately, the manufacture, supply and use of engineered stone was prohibited in WA from 1 July 2024, reflecting how seriously silica exposure is now treated across the WA construction sector.
What this means for how we clean: wet methods and vacuum-led dust control, rather than broom-and-blower knock-down, are the right default on a site that has generated crystalline silica dust. What we do not do, and will not claim, is air monitoring, health monitoring or operate under a documented silica risk control plan — air monitoring specifically needs to be carried out by a competent person such as a certified occupational hygienist, and that is a separate, specialised service to a construction clean.
What a clean can fix, and what it cannot
Setting expectations before the job starts is worth more than a good story afterwards. A construction clean removes dust, debris, adhesive residue, grout haze, mortar splatter and general soiling — it does not repair scratched glass, damaged protective film left on too long, etched tile, or cured silicone that has bonded into a porous stone surface. Those are damage or installation issues, not cleaning issues, and pushing harder with a cloth or a blade on them tends to make the mark worse rather than better.
We flag anything that looks like it falls into that category before we start work on it, rather than discover it during the final walkthrough. It is a more useful conversation to have up front, and it is exactly the kind of thing builders tell us they wish a cleaning contractor had raised earlier rather than leaving them to find out at handover.
STANDARDS & COMPLIANCE
Standards & compliance on a WA construction site
Work Health and Safety Act 2020 (WA) and WHS (General) Regulations 2022 (WA)
- Who it binds
- The principal contractor and every PCBU with duties on the site, including us while our crew is present
- What it requires
- Duties on a construction site overlap between the principal contractor and every other PCBU working there, and each must consult, cooperate and coordinate with the others so far as is reasonably practicable.
- What we do
- We work within your site induction and safety system, and coordinate directly with your site supervisor on access, timing and any restricted areas.
Crystalline silica duties — WHS (General) Regulations 2022 (WA)
- Who it binds
- PCBUs whose work processes crystalline silica substances
- What it requires
- Amendments covering crystalline silica substances commenced 1 September 2024, and WorkSafe WA treats sweeping or pressurised air blowing of dust containing crystalline silica as covered high-risk work in its own right.
- What we do
- We favour wet methods and vacuum-led dust control over dry sweeping or air-blowing on sites carrying construction dust.
We do not perform air monitoring or health monitoring, and we do not operate under a documented silica risk control plan — air monitoring in particular requires a competent person such as a certified occupational hygienist.
Safe Work Method Statements (SWMS)
- Who it binds
- The PCBU carrying out high risk construction work
- What it requires
- A SWMS is a legal requirement specifically for high risk construction work as defined in the regulations — it is not a blanket requirement for every task on a construction site.
- What we do
- We supply a SWMS where your principal contractor requires one, or where the task on your site meets the definition of high risk construction work.
Standards information current as at July 2026.
HOW THIS IS PRICED
How this is priced
- Which stage or stages — rough, final, sparkle, defect
- Total floor area and number of rooms
- Site condition at the time of the clean
- Glass count and window/track detail required
- Floor type and finish
- Whether protective film is still in place
- Rubbish and debris volume on site
- Access and program timing pressure
Price on application — request a quote for a clear, fixed price after a site walkthrough.
WHY GENRE
Why Genre Solutions
- Stage-by-stage flexibilityEngage us for all stages from rough through to handover, or bring us in for just the final and defect cleans — we fit your project program.
- Upfront about what we cannot fixScratched glass, damaged protective film, etched tile and cured silicone on porous stone are damage, not soiling — we flag these before we start, not at handover.
- Owner-supervised crewsThe standard is set and supervised by the owner. On a handover clean, the finish has to be right — we do not send unsupervised crews to a client walkthrough.
Related services
- Pressure WashingPair a driveway, alfresco or perimeter pressure clean with your final or handover clean.
- End of Lease CleaningThe vacate-clean equivalent for tenants moving out of a completed property.
- Carpet CleaningNew carpet protection and post-construction carpet cleaning ahead of handover.
- Industrial & Warehouse CleaningOngoing cleaning once a commercial or industrial build is handed over and operating.
Insured & police-checked
- WA owned & operated
- $20M public liability insured
- Police-checked crews
- WHS & safety-first
- Perth-based, locally operated
- After-hours available
Builders cleaning FAQ
What is a builders clean and what does it include?
What's the difference between a builders clean and a vacate or bond clean?
When in the build should a clean be booked?
Do you do rough cleans as well as final cleans?
How do you handle construction dust safely?
Do your crews have site induction?
Can you remove paint, silicone, adhesive and stickers from glass?
Can you get grout haze and mortar off new tiling without scratching it?
Why does a properly done final clean matter for the defect list?
Do you supply a SWMS for construction sites?
Can you work around other trades still on site?
Do you clean the garage, alfresco, driveway and site perimeter?
Request a quote
Price on application — request a quote or a free site walkthrough and we'll give you a clear, fixed price.